Skip to main navigation Skip to search Skip to main content

CASTLE: A Cascaded Spatio-Temporal Approach for Long-lead Streamflow Forecasting

  • Yong Zhuang
  • , David L. Small
  • , Patrick D. Flynn
  • , Wahid Palash
  • , Shafiqul Islam
  • , Ping Chen
  • , Wei Ding
  • Grand Valley State University
  • Lafayette City Center
  • University of Massachusetts Boston
  • Integrated Sustainability
  • Tufts University

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution

Abstract

Effective early warning systems for extreme flood events in large river basins necessitate reliable long-lead streamflow forecasts. However, the inherent uncertainty within each phase of the weather system-rainfall prediction, runoff generation, and streamflow prediction-amplifies with each stage, rendering accurate long-lead streamflow estimations challenging. In response to this, our study introduces a novel deep-learning-based model, the Cascaded Spatio-Temporal Learning Deep Network (CASTLE). CASTLE synergistically integrates observed upstream precipitation, recent streamflow data, and short-term precipitation forecasts derived from a selection of quantitative climate models to produce an accurate streamflow estimate. Specifically, we employ deep residual architectures on both observed and forecasted precipitation data to model the cascading spatio-temporal processes, which begin with upstream rainfall, move to rainfall-runoff, and finally conclude with downstream discharge. Our aim is to identify hidden space-time patterns that can be used to forecast future downstream flow over extended periods. We assess CASTLE's efficacy by forecasting the downstream discharge of the Ganges River over a long lead time. Results show that our approach outperforms the current state-of-the-art streamflow forecasting models.

Original languageEnglish
Title of host publicationProceedings - 2023 IEEE International Conference on Big Data, BigData 2023
EditorsJingrui He, Themis Palpanas, Xiaohua Hu, Alfredo Cuzzocrea, Dejing Dou, Dominik Slezak, Wei Wang, Aleksandra Gruca, Jerry Chun-Wei Lin, Rakesh Agrawal
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages1031-1038
Number of pages8
ISBN (Electronic)9798350324457
DOIs
StatePublished - 2023
Event2023 IEEE International Conference on Big Data, BigData 2023 - Sorrento, Italy
Duration: Dec 15 2023 → Dec 18 2023

Publication series

NameProceedings - 2023 IEEE International Conference on Big Data, BigData 2023

Conference

Conference2023 IEEE International Conference on Big Data, BigData 2023
Country/TerritoryItaly
CitySorrento
Period12/15/23 → 12/18/23

ASJC Scopus Subject Areas

  • Artificial Intelligence
  • Computer Networks and Communications
  • Computer Science Applications
  • Information Systems
  • Information Systems and Management
  • Safety, Risk, Reliability and Quality

Fingerprint

Dive into the research topics of 'CASTLE: A Cascaded Spatio-Temporal Approach for Long-lead Streamflow Forecasting'. Together they form a unique fingerprint.

Cite this