Skip to main navigation Skip to search Skip to main content

Extended experience with a short-term hydropower scheduling model in New England

  • Paul H. Kirshen
  • Unknown

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution

Abstract

The New England Power Exchange (NEPEX) is responsible for the central dispatch of power throughout New England. To assure the maximum benefits of power pooling, the electric facilities of all member companies are operated as though they comprised a single electric system. Using state-of-the-art computer facilities, system operators monitor and direct operations of all major generators and transmission lines everyday, 24 hours a day. NEPEX personnel make minute-by-minute decision which are essential to meeting prescribed reliability standards and providing electricity to customers at the lowest possible cost. Hydroelectric power supplies approximately 10% of the electricity in New England. The major source of hydropower is the 11,250 square mile Connecticut River Basin with 16 stations and approximately 600 MW of capacity on the Deerfield and Connecticut Rivers. In fall 1985, the manual methods of hourly hydro scheduling, and the storage of engineering, operating, and hydrologic data were complemented by a user-friendly computer system, HydroMAX (the System).

Original languageEnglish
Title of host publicationWater Resources Planning and Management
Subtitle of host publicationSaving a Threatened Resource - In Search of Solutions, Proceedings of the Water Resources Sessions at Water Forum
PublisherPubl by ASCE
Pages299-304
Number of pages6
ISBN (Print)0872628760
StatePublished - 1992
Event1992 National Conference on Water Resources Planning and Management - Water Forum '92 - Baltimore, MD, USA
Duration: Aug 2 1992 → Aug 6 1992

Publication series

NameWater Resources Planning and Management: Saving a Threatened Resource - In Search of Solutions, Proceedings of the Water Resources Sessions at Water Forum

Conference

Conference1992 National Conference on Water Resources Planning and Management - Water Forum '92
CityBaltimore, MD, USA
Period8/2/92 → 8/6/92

ASJC Scopus Subject Areas

  • General Environmental Science

Fingerprint

Dive into the research topics of 'Extended experience with a short-term hydropower scheduling model in New England'. Together they form a unique fingerprint.

Cite this