HYDROMAX COMPUTERIZED HYDROPOWER SCHEDULING.

  • Paul H. Kirshen
  • , James A. Ginnetti
  • ERT

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution

Abstract

The New England Power Exchange (NEPEX) is currently using the HydroMAX Program to schedule daily hydropower operations for the 17 stations in the 11,250 square mile Connecticut River Basin. Hydromax is an integrated software database and optimization package which complements the expertise of hydro operations staff. The system is menu-driven and designed to be user-friendly. Benefits include automated data collection and archival, optimization to aid hydro schedulers, rapid response to changing river conditions, improved dissemination of hydro schedules, and improved hydro dispatching. The system will more than pay for itself in two years.

Original languageEnglish
Title of host publicationUnknown Host Publication Title
EditorsMichael J. Roluti
PublisherASCE
Pages1936-1947
Number of pages12
ISBN (Print)0872625362
StatePublished - 1986

ASJC Scopus Subject Areas

  • General Engineering

Fingerprint

Dive into the research topics of 'HYDROMAX COMPUTERIZED HYDROPOWER SCHEDULING.'. Together they form a unique fingerprint.

Cite this