Abstract
Risk registers are widely used across government and industry to document and prioritize risks for specific goals or projects. Recent U.S. policy developments, including Executive Order 14239 calling for a National Risk Register, underscore both the preeminence and the limitations of current approaches. Their traditional design emphasizes risk cataloging and mitigation over resilience, limiting their value for managing today's interconnected and evolving disruptions. This paper introduces a Resilience-Enhanced Risk Register (RERR) framework structured to move risk accounting beyond static documentation by embedding resilience metrics across physical, informational, and social domains and across the temporal phases of disruption. Unlike prior risk registers or resilience models, the RERR can integrate existing risk assessment methodologies with these standardized resilience measures. Drawing on comparative analysis of U.S. and international systems, the RERR provides a framework for a scalable, sector-based approach that can align investments with resilience outcomes across governance levels.
| Original language | English |
|---|---|
| Article number | 106461 |
| Journal | International Journal of Disaster Risk Reduction |
| Volume | 145 |
| DOIs | |
| State | Published - Oct 15 2026 |
ASJC Scopus Subject Areas
- Geotechnical Engineering and Engineering Geology
- Safety Research
- Geology
Keywords
- Decision-making
- Resilience
- Risk assessment
- Risk registers
Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS