TY - GEN
T1 - Towards long-lead forecasting of extreme flood events
T2 - 19th ACM SIGKDD International Conference on Knowledge Discovery and Data Mining, KDD 2013
AU - Wang, Dawei
AU - Ding, Wei
AU - Yu, Kui
AU - Wu, Xindong
AU - Chen, Ping
AU - Small, David L.
AU - Islam, Shafiqul
N1 - Publisher Copyright:
Copyright © 2013 ACM.
PY - 2013/8/11
Y1 - 2013/8/11
N2 - The development of disastrous flood forecasting techniques able to provide warnings at a long lead-Time (5-15 days) is of great importance to society. Extreme Flood is usually a consequence of a sequence of precipitation events occurring over from several days to several weeks. Though precise shortterm forecasting the magnitude and extent of individual precipitation event is still beyond our reach, long-Term forecasting of precipitation clusters can be attempted by identifying persistent atmospheric regimes that are conducive for the precipitation clusters. However, such forecasting will suffer from overwhelming number of relevant features and high imbalance of sample sets. In this paper, we propose an integrated data mining framework for identifying the precursors to precipitation event clusters and use this information to predict extended periods of extreme precipitation and subsequent floods. We synthesize a representative feature set that describes the atmosphere motion, and apply a streaming feature selection algorithm to online identify the precipitation precursors from the enormous feature space. A hierarchical re-sampling approach is embedded in the framework to deal with the imbalance problem. An extensive empirical study is conducted on historical precipitation and associated flood data collected in the State of Iowa. Utilizing our framework a few physically meaningful precipitation cluster precursor sets are identified from millions of features. More than 90% of extreme precipitation events are captured by the proposed prediction model using precipitation cluster precursors with a lead time of more than 5 days.
AB - The development of disastrous flood forecasting techniques able to provide warnings at a long lead-Time (5-15 days) is of great importance to society. Extreme Flood is usually a consequence of a sequence of precipitation events occurring over from several days to several weeks. Though precise shortterm forecasting the magnitude and extent of individual precipitation event is still beyond our reach, long-Term forecasting of precipitation clusters can be attempted by identifying persistent atmospheric regimes that are conducive for the precipitation clusters. However, such forecasting will suffer from overwhelming number of relevant features and high imbalance of sample sets. In this paper, we propose an integrated data mining framework for identifying the precursors to precipitation event clusters and use this information to predict extended periods of extreme precipitation and subsequent floods. We synthesize a representative feature set that describes the atmosphere motion, and apply a streaming feature selection algorithm to online identify the precipitation precursors from the enormous feature space. A hierarchical re-sampling approach is embedded in the framework to deal with the imbalance problem. An extensive empirical study is conducted on historical precipitation and associated flood data collected in the State of Iowa. Utilizing our framework a few physically meaningful precipitation cluster precursor sets are identified from millions of features. More than 90% of extreme precipitation events are captured by the proposed prediction model using precipitation cluster precursors with a lead time of more than 5 days.
KW - Flood forecasting
KW - Online streaming feature selection
KW - Spatialtemporal data mining
UR - https://www.scopus.com/pages/publications/84988529188
UR - https://www.scopus.com/pages/publications/84988529188#tab=citedBy
U2 - 10.1145/2487575.2488220
DO - 10.1145/2487575.2488220
M3 - Conference contribution
AN - SCOPUS:84988529188
T3 - Proceedings of the ACM SIGKDD International Conference on Knowledge Discovery and Data Mining
SP - 1285
EP - 1293
BT - KDD 2013 - 19th ACM SIGKDD International Conference on Knowledge Discovery and Data Mining
A2 - Parekh, Rajesh
A2 - He, Jingrui
A2 - Inderjit, Dhillon S.
A2 - Bradley, Paul
A2 - Koren, Yehuda
A2 - Ghani, Rayid
A2 - Senator, Ted E.
A2 - Grossman, Robert L.
A2 - Uthurusamy, Ramasamy
PB - Association for Computing Machinery
Y2 - 11 August 2013 through 14 August 2013
ER -